Full View
Similar items
Nylon Dog For Small And Large Dogs, Outdoor Training, Pet Long Pull Rope, Puppy Waist Extending Leash 6m, 10m, 15m, 30m, By PawParty Store
£8.21£16.63
Color : black

Size : 1.5m
1.5m
1.8m
3m
6m
10m
15m
20m
30m
50m
Quantity :
Report
Include copyright infringementFree Standard Shipping. See details
Estimated between Fri, Jul 24 and Mon, Jul 27
You can return the product within 30 days of receipt. See details
Shop with confidence
Money Back Guarantee
Get the item you ordered or your money back. Learn more
About this item
Sourced from PawParty Store
Seller assumes all responsibility for this listing.Item number: 35380135
Item specifics
Item description from the seller
Nylon Dog Leash for Small Large Dogs, Outdoor Training, Long Pet Traction Rope, Puppy Leash, Extendable 6m, 10m, 15m, 30m, 50m, Supplies
Product: nylon dog leash
Color: black
Length: 1.5 m/1.8 m/3 m/6 m/10 m/15 m/20 m/30 m/50 m
Feature: durable, made of nylon material, long, sturdy, long-lasting, easy to use.
Support: Direct delivery and wholesale
Suit for: outdoor, hiking, walking
Suitable for: small, medium, large dogs, cats, puppies, Yorkie, Chihuahua, French Bulldog, Dachshund, Beagle, Schnauzer, Poodle, Pitbull, Golden Retriever, Labrador, German Shepherd
NOTE
1.Due to manual measurement, please allow a margin of error of 0.5-1 cm.
2. Due to the difference in display and lighting effects, the actual color of the item may be slightly different from the color shown in the picture.








Videos
Videos for this product









