Full View
Similar items
Grey Adjustable Anti-Pull Dog Collar, Pet Neck Cover For Large Dogs Training & Walking
£17.24
Flower Collar Leash Set Custom Small Medium Large Pet Floral Print Nylon Dog Collars With Treat Snack Bag
£28.72
Adjustable Pet Collars Nylon Puppy Kitten Collar Strong Durable Neck Band Suitable For Small Medium Dogs And Cats
£24.23
Mermaid Theme Iridescent Pet Collar Soft Comfort Inner Lining For Small Pets
£30.20
Grey Adjustable Anti-Pull Dog Collar, Pet Neck Cover For Large Dogs Training & Walking
£17.24
Grey Adjustable Anti-Pull Dog Collar, Pet Neck Cover For Large Dogs Training & Walking
£17.24
Large Dog Training Collar, Adjustable Anti-Pull Pet Neck Cover, Durable Traction Collar For Walking & Training
£19.54
Adjustable Pet Traction Collar, Anti-Pull Training Neck Cover For Medium Large Dogs, 7 Days Fast Delivery To Germany
£19.54
SQCLV Reflective Dog Collar With Cute Paw Rivet Studded Funny Soft PU Leather Adjustable Puppy Dog Collars For Small Medium Large Dogs Cats (Pink,Smal
£17.23
Luxury Personalized Dog Collar Harness Leash Set Custom, Collar With Engraved Name Buckle, Dog Harness And Leash Set DIY
£19.29
1.5 1.8 3 6 10 15 20 30 50M Solid Leash For Large Dogs Pet Puppy Walking Training Lead Big Dog Nylon Rope Long Leashes
£18.79
Color : C794-Black 1.5M









Quantity :
Report
Include copyright infringementFree Standard Shipping. See details
Estimated between Sun, Aug 2 and Wed, Aug 5
You can return the product within 30 days of receipt. See details
Shop with confidence
Money Back Guarantee
Get the item you ordered or your money back. Learn more
About this item
Sourced from Pet Supplies Mall
Seller assumes all responsibility for this listing.Item number: 40384255
Item specifics
Item description from the seller
Long Strong Nylon Dog Leash 10m 15m 20m Pet Training Leash For Small Big Dogs Outdoor Walking Puppy Lead Rope Labrodor Supplies
Product:Nylon Dog Leash
Color:Black
Length:1.5m/1.8m/3m/6m/10m/15m/20m/30m/50m*2cm
Feature:Durable,Nylon Material, Long ,Strong,Durable,Convenient to operate
Support:Dropshipping and Wholesale
Suit:Outdoor,Hiking,Walking
Suit for:Small,Medium,Large Dogs,Cats,Puppy ( Yorkie,Chihuahua,French Bulldog,Dachshund,Beagle,Schnauzer,Poodles,Pitbull,Golden retriever,Labrador retriever,German Shepherd)
NOTE
1.Due to manual measurement, please allow a measurement deviation of 0.5-1 cm.
2.Due to the difference in display and lighting effects, the actual color of the item may be slightly different from the color shown on the picture.








Videos
Videos for this product







